Introduction: The Lifelines of Underground Mining
Picture yourself hundreds of meters below the earth's surface. The air is thick with coal dust, the space is confined, and powerful machinery cuts through rock and coal. What's keeping everything running safely? Cables—specifically, specialized mining cables like the PROTOMONT(Z) NSSHKCGEOEU 0.6/1KV. These aren't your everyday electrical cables; they're the lifelines of underground mining operations.
I've spent years working with mining equipment, and if there's one thing I've learned, it's that proper cable maintenance can mean the difference between a productive shift and a dangerous situation. When a cable fails deep underground, it's not just an inconvenience—it can halt production, damage expensive equipment, or worse.
Splicing mining cables is a skill that combines technical knowledge, precision, and experience. It's something of an art form in the mining world, and today I'm going to walk you through the process, focusing specifically on how to handle the robust PROTOMONT(Z) NSSHKCGEOEU coal cutter cables that are essential in modern mining operations.
Understanding PROTOMONT(Z) NSSHKCGEOEU 0.6/1KV Cables
What Makes These Cables Special?
The PROTOMONT(Z) NSSHKCGEOEU 0.6/1KV isn't just a random jumble of letters and numbers—it's a designation that tells you exactly what you're working with. The "(Z)" indicates these cables are designed for free trailing operations, meaning they can be dragged behind mining equipment for considerable distances without sustaining damage.
These cables are specifically engineered for coal cutting machines, which operate in some of the most demanding environments imaginable. The voltage rating of 0.6/1KV indicates they can handle nominal voltages up to 0.6kV between conductor and earth, and up to 1kV between conductors.
What really sets these cables apart is their construction. They typically feature:
A robust outer jacket resistant to abrasion, oil, and moisture
Multiple layers of insulation and shielding
Flexible copper conductors that can withstand repeated bending
Special compounds that make them flame-retardant and self-extinguishing
Enhanced mechanical protection for the harsh mining environment
When and Why These Cables Need Splicing
Even the toughest cables eventually need maintenance. In my experience, there are several common scenarios where splicing becomes necessary:
Accidental damage is probably the most common—a cable might get crushed under equipment or cut by a sharp edge. Sometimes it's wear and tear from being dragged across rough surfaces day after day. Other times, it's environmental factors like moisture ingress or chemical exposure that compromise the cable's integrity.
Whatever the cause, when a section of cable becomes damaged, you have two options: replace the entire length (which can be extremely costly) or splice the cable to repair the damaged section. That's where the skill of proper splicing becomes invaluable.
Essential Tools for Mining Cable Splicing
Before diving into the splicing process, let's talk about the tools you'll need. Having the right equipment isn't just about convenience—it's about safety and ensuring a splice that will last in demanding conditions.
Basic Tool Kit
Every splicing job requires a fundamental set of tools:
Cable cutters: Heavy-duty and properly insulated
Cable strippers: For removing the outer jacket without damaging inner components
Utility knife: Sharp and with replaceable blades
Measuring tape: For precise measurements
Wire strippers: Various sizes to match conductor gauges
Crimping tools: For connecting conductors securely
Heat gun: For heat-shrink tubing application
Electrical tape: High-quality, mining-grade insulating tape
Multimeter: For testing connections and continuity
Specialized Equipment for PROTOMONT(Z) Cables
When working specifically with PROTOMONT(Z) NSSHKCGEOEU cables, you'll also need:
Specialized shielding tools: These cables have complex shielding that requires proper handling
Connector kits: Manufacturer-recommended connectors designed for these specific cables
Heat-shrink splice kits: Specially designed for mining applications
Insulation resistance tester: For verifying the integrity of your splice
Phase identification markers: For proper phase matching
I remember once trying to make do with general-purpose tools on a PROTOMONT cable deep in a mine in West Virginia. Big mistake. The splice failed within 24 hours, and we had to shut down operations to fix it properly. Trust me on this—invest in the right tools.
Safety Precautions: Before You Begin
Let's get real for a moment. We're talking about working with electrical cables in a mining environment—possibly one of the most hazardous combinations imaginable. Safety isn't just a box to check; it's the difference between going home at the end of your shift or not.
Electrical Safety
Verify power isolation: Never, and I mean NEVER, attempt to splice a cable that hasn't been properly isolated from power sources.
Lock-out/tag-out procedures: Follow your mine's procedures to the letter.
Test before touching: Use a voltage tester to verify the absence of voltage in the cable.
Grounding: Ensure proper grounding before beginning work.
Personal protective equipment: Insulated gloves, face shield, and appropriate clothing are non-negotiable.
Environmental Considerations
The mining environment adds additional challenges:
Ventilation: Ensure adequate air flow, especially if using heat guns or working with adhesives.
Moisture control: Create a dry work area if possible—moisture is the enemy of a good splice.
Dust management: Coal dust is conductive and can compromise your splice.
Lighting: Proper illumination is essential for precision work.
Step-by-Step Guide to Splicing PROTOMONT(Z) NSSHKCGEOEU Cables
Now we're getting to the heart of the matter. I'll walk you through the splicing process step by step, with some hard-earned tips along the way.
1. Preparation Phase
Inspect the damage: Carefully examine the extent of the damage to determine how much cable needs to be removed.
Measure twice, cut once: Mark the section to be removed, allowing extra length on both sides to ensure you're working with undamaged cable.
Secure the cable: Use cable stands or supports to keep the cable stable during work.
Clean the work area: Remove dust, moisture, and debris from the immediate vicinity.
2. Cutting and Removing the Damaged Section
Use sharp, properly sized cable cutters to make clean, perpendicular cuts through the entire cable.
Make sure the cuts are at least 15-20 cm beyond any visible damage—internal damage often extends further than what's visible.
Carefully dispose of the damaged section according to your mine's waste management procedures.
3. Preparing Cable Ends
This is where the real precision work begins:
Outer jacket removal: Use a cable stripper or utility knife to carefully remove about 10-15 cm of the outer jacket from each cable end. Be extremely careful not to damage the underlying components.
Shielding preparation: For PROTOMONT(Z) cables, the shielding is critical. Carefully fold back the shielding braid without damaging it.
Inner jacket removal: If present, remove the appropriate length of inner jacket to expose the individual conductors.
Conductor preparation: Strip each conductor to the appropriate length for your connectors, typically about 2.5 cm.
I once watched an experienced miner take nearly 45 minutes just to prepare the cable ends. When I asked why he was being so meticulous, he said, "A rushed splice is a failed splice. And a failed splice can mean a fire underground." Those words have stuck with me for decades.
4. Conductor Splicing
Match phase colors: Ensure you're connecting matching conductors/phases.
Apply connectors: Use the appropriate crimping connectors for the conductor size.
Crimp properly: Make sure your crimps are secure but not overly compressed, which could damage the conductor strands.
Test each connection: Use a multimeter to check continuity on each spliced conductor.
5. Insulating Individual Conductors
Apply heat-shrink tubing over each crimped connection, ensuring it extends beyond the connector on both sides.
Use a heat gun to shrink the tubing evenly, starting from the center and working outward to avoid trapping air bubbles.
Allow each connection to cool before proceeding to the next step.
6. Reconstructing the Cable Assembly
Reposition the shielding: Carefully bring the shielding back into position to ensure continuous shielding across the splice.
Connect the shielding: Use the appropriate method (usually a specialized connector or crimped jumper) to ensure electrical continuity of the shield across the splice.
Apply inner jacketing: If your cable has an inner jacket, apply the appropriate heat-shrink or tape to reconstruct this layer.
7. Final Outer Jacketing
Position the outer jacket heat-shrink tubing over the entire splice, ensuring adequate overlap with the original cable jacket.
Shrink the tubing evenly, again working from the center outward.
Some specialized mining splice kits include additional protective layers—follow the manufacturer's instructions precisely.
8. Testing the Completed Splice
Never skip this step. A proper test includes:
Continuity testing: Verify electrical continuity through each conductor.
Insulation resistance testing: Confirm the integrity of the insulation.
Shield continuity testing: Ensure the shield provides continuous protection.
Visual inspection: Check for any visible defects or irregularities.
Common Mistakes and How to Avoid Them
Over the years, I've seen (and, yes, occasionally made) just about every splicing mistake possible. Here are the big ones to avoid:
Insufficient Preparation
Rushing through preparation is the number one cause of splice failures. Take your time, follow procedures, and make sure your work area and tools are properly set up.
Improper Crimping
A loose crimp will create resistance, leading to heat buildup and eventual failure. Too tight, and you'll damage the conductor strands, reducing current capacity. Practice proper crimping technique and use the correct tools.
Inadequate Insulation
Skimping on insulation or using general-purpose materials instead of mining-grade components is asking for trouble. The mining environment is uniquely harsh—your materials need to match the challenge.
Neglecting the Shield
The shield in PROTOMONT(Z) cables serves critical safety and performance functions. Failing to properly reconnect it compromises the entire cable system.
Moisture Intrusion
Water and electricity don't mix. Even tiny amounts of moisture trapped in your splice can lead to catastrophic failure. Ensure complete dryness before and during the splicing process.
Best Practices for Long-Lasting Splices
Want your splice to last as long as the original cable? Here's how:
Use Manufacturer-Recommended Components
Generic splice kits might save a few dollars upfront, but they're rarely designed for the specific demands of mining cables like the PROTOMONT(Z) NSSHKCGEOEU. Invest in the right components.
Document Your Work
Keep detailed records of all splices, including location, date, materials used, and the person who performed the work. This information is invaluable for maintenance planning and troubleshooting.
Regular Inspection
Establish a routine inspection schedule for all spliced cables. Early detection of problems can prevent catastrophic failures.
Training and Certification
Ensure that anyone performing cable splices has proper training and, where applicable, certification. This isn't a skill you can pick up through trial and error.
Environmental Protection
Where possible, provide additional mechanical protection for spliced sections, especially in high-traffic areas or locations with particular environmental challenges.
Conclusion: The Art and Science of Mining Cable Splicing
Splicing PROTOMONT(Z) NSSHKCGEOEU 0.6/1KV coal cutter cables is both an art and a science. It requires technical knowledge, precision, patience, and a healthy respect for the dangers involved.
Done properly, a splice can provide years of reliable service in the harshest underground conditions. Done poorly, it can lead to downtime, equipment damage, or safety incidents. The difference comes down to having the right tools, following the correct procedures, and taking the time to do the job right.
In my thirty-plus years working with mining equipment, I've seen the industry evolve in countless ways. But one thing hasn't changed: the critical importance of reliable electrical systems underground. And at the heart of those systems are properly maintained cables like the PROTOMONT(Z) NSSHKCGEOEU.
Remember, when you're splicing these cables, you're not just fixing a piece of equipment—you're helping to ensure the safety and productivity of everyone working in that mine. That's a responsibility worth taking seriously.

Frequently Asked Questions (FAQ)
1. What type of mining equipment is this cable designed for?
The PROTOMONT(Z) 0.6/1kV Cable is specially made for mobile underground mining machines such as coal shearers, roadheaders, TBMs, and scoops (LHDs) that require a free trailing power connection.
2. Can this cable be used in open-pit mines or just underground?
While designed for underground operations, this cable can also be used in open-pit environments with moderate mechanical stress, particularly for mobile equipment and trailing applications like conveyors and drills.
3. Is this cable flame-retardant?
Yes, it is flame-retardant and meets EN/IEC 60332-1-2 standards, making it safe for underground coal mines where fire risk is high.
4. Does this cable resist oil and grease exposure?
Absolutely. The outer sheath is oil-resistant, making it ideal for mine floors where hydraulic fluid, diesel, or lubricants are commonly spilled.
5. Can the cable handle exposure to sunlight or UV radiation?
Yes, the PCP outer sheath is UV-resistant, making it suitable for use in open-pit mining or temporary outdoor deployments.
6. What is the maximum distance this cable can trail behind machinery?
Its flexible construction and steel braiding allow it to be trailed for long distances, depending on machine type and bending radius requirements.
7. What is the maximum temperature the cable can withstand?
The maximum conductor temperature is 90°C during operation, and it can tolerate up to 250°C during short circuits.
8. How does this cable perform in freezing climates like Russia or Mongolia?
The cable remains flexible down to -20°C for mobile installations and can operate at -40°C in fixed positions, making it ideal for high-altitude, cold-weather mining.
9. Does this cable offer resistance to mechanical stress like dragging or impact?
Yes. With its galvanised steel braid reinforcement, the cable offers high tensile and crush resistance, making it perfect for rugged mining terrain.
10. Can this cable be used for mobile stacker-reclaimers in stockyards?
Yes, its flexibility, oil-resistance, and UV durability make it suitable for stacker-reclaimer trailing operations in material yards and loading ports.
11. How are the cores identified in this cable?
The three main cores are black, grey, and brown, with blue control cores to ensure easy installation and fault detection.
12. What is the voltage rating of this cable?
The rated voltage is 0.6/1kV, suitable for medium-power supply to heavy machinery.
13. What type of insulation is used inside the cable?
The main insulation is made from EPR rubber, a compound known for its thermal and electrical reliability in mining operations.
14. What material is used for the cable sheath?
The outer sheath is made from polychloroprene rubber (PCP), a flame-resistant and oil-resistant compound branded as PROTOFIRM 5GM5.
15. Can this cable handle steep gradients or vertical lifts in mine shafts?
Yes, thanks to its high tensile strength and braided steel reinforcement, it can manage vertical and inclined pulling forces effectively.
16. Is the cable suitable for continuous reeling and unreeling?
While it is designed for free trailing, it's not ideal for continuous reeling drum systems; reeling-specific cables should be used for that purpose.
17. Can the cable be customised for specific mine conditions?
Yes, Feichun Cable offers customisation, including different conductor sizes, control core configurations, and outer sheath compounds based on customer requirements.
18. What makes this cable ideal for TBM applications?
Its durable insulation, multi-core structure, and high flexibility make it reliable for the moving, rotating, and vibrating environment inside TBM systems.
19. Does this cable comply with MSHA standards?
Yes, it has MSHA P-189-4 flame approval, ensuring it meets U.S. mining safety regulations.
20. Can this cable be installed in wet and muddy environments?
Yes, it’s designed for wet, muddy, and abrasive terrains common in mining and tunnelling operations.
21. How does the cable handle electromagnetic interference?
Its double-concentric control/PE wire spinning helps minimise electromagnetic noise, improving electrical stability.
22. What is the bend radius for installation?
The bend radius varies depending on size, but is generally 7x the cable diameter for mobile use, ensuring no damage during trailing.
23. Is this cable resistant to ozone degradation?
Yes, the outer jacket is ozone-resistant, preventing cracks and degradation in underground environments with poor air quality.
24. Can the cable support drilling rigs or jumbo drills?
Yes, it can be used for trailing or semi-permanent connections to mobile drilling machines in underground or surface operations.
25. What is the test voltage for this cable?
The test voltage is 3kV for power conductors and 2kV for control cores, ensuring high dielectric performance.
26. How long is the expected service life?
With proper use, the cable can last 5–10 years, depending on mechanical stress, UV exposure, and installation practices.
27. Does it support low-voltage drop across long distances?
Yes, with finely stranded copper cores and optimised conductor sizing, it maintains efficient voltage levels over long trailing distances.
28. Can the cable be repaired onsite if damaged?
Yes, trained technicians can perform rubber cable splicing and heat-shrink repairs, though severe damage should be handled in a controlled environment.
29. Can this cable be used with mobile conveyor belt systems?
Yes, it’s ideal for powering mobile or semi-mobile conveyor systems in surface and underground mining operations.
30. How does it compare to SHD-GC or Type 241 mining cables?
While SHD-GC is popular in North America and Type 241 is common in Australia, PROTOMONT(Z) offers European-standard construction, superior flexibility, and better trailing performance for machine-connected applications.
31. Where can I get technical support for cable sizing and installation?
Feichun Cable offers complete engineering assistance, from cable sizing calculations to installation guidelines and after-sales support.
Feichun PROTOMONT(Z) NSSHKCGEOEU 0.6/1kV Coal Cutter Cable: Built for Reliable Trailing in Harsh Underground Mining Environments
Discover the Feichun PROTOMONT Coal Cutter Cable: engineered for reliability and performance in harsh underground mining environments.
3/5/202511 min read